Steps to Build a house # বাড়ী নির্মানের পূর্বে যে সকল কাজ করা উচিত
A Building is not only a structure. It's a dream of owner. with out proper planning, isn't possible to complete a good structure. So we need a proper plan or complete steps to build a house. Such the steps -
Proper planning:
Plan -1 : Approval Required from Authority. (Such as RAJUK, CDA,KDA,RDA etc Authority, Same as Pourosova)
plan -2 : electric construction line. (DESCO, Pollibiddut, NWES etc)
plan -3 : water construction line.(WASA)
plan -4 : site cleaning. (Old Construction sale or cleaning)
plan -5 : Proper soil test.
plan -6 : drawings complete (Architectural Drawings. Structural Drawings. Electrical Drawings. Plumbing Drawings.)
plan -7 : making sheds. Guard Room, Labor Room, Material Stock Shed. Toilet (Water Connection, Sewerage Connection..), Kitchen (GAS Connection..).
plan -8 : agreement with Contractor. (RCC Contractor, Electrical Contractor,
Plumbing Contractor)
শুক্রবার, ২১ আগস্ট, ২০২০
বৃহস্পতিবার, ২৬ মার্চ, ২০২০
RAJUK, CDA, KDA, RDA Drawing Rules || রাজুক আপনার জায়গার জন্য কত তলা ইমা...
How to understand that how much floor area & height approval possible from RAJUK, CDA, KDA and other Authority for your land.
আপনার জমির জন্য রাজউক, সিডিএ, কেডিএ এবং অন্যান্য কর্তৃপক্ষের কত তল এলাকা এবং উচ্চতার অনুমোদন সম্ভব তা কীভাবে বোঝা যায়।
এতে সদস্যতা:
মন্তব্যসমূহ (Atom)